{"id":25133,"date":"2020-08-07T20:23:35","date_gmt":"2020-08-07T20:23:35","guid":{"rendered":"https:\/\/one.sightlinemg.com\/airforcetimes\/uncategorized\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/"},"modified":"2026-08-07T20:42:54","modified_gmt":"2026-08-07T20:42:54","slug":"after-massive-floods-offutt-looks-to-build-a-better-base","status":"publish","type":"post","link":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/","title":{"rendered":"After massive flood, Offutt looks to build a better base"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In March 2019, the waters of the Missouri River engulfed dozens of buildings and more than <a href=\"https:\/\/www.airforcetimes.com\/news\/your-air-force\/2019\/03\/28\/offutt-runway-gets-clean-bill-of-health-after-flooding-limited-operations-resume\/\" target=_blank>half a mile of runway<\/a> at <a href=\"https:\/\/www.airforcetimes.com\/news\/your-air-force\/2019\/03\/18\/floodwaters-overwhelm-one-third-of-offutt-nine-aircraft-evacuated\/\" target=_blank>Offutt Air Force Base<\/a> in Nebraska, forced nine aircraft to evacuate and displaced thousands of personnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But nearly a year and a half later, Offutt is well on the <a href=\"https:\/\/www.airforcetimes.com\/news\/your-air-force\/2019\/05\/02\/air-force-increases-estimate-to-repair-and-rebuild-offutt-to-420-million\/\" target=_blank>road to recovery<\/a> from these devastating floods.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And in some ways, according to the officer overseeing the rebuilding effort, the flood has had a \u201csilver lining,\u201d allowing Offutt to rebuild in a better, more thoughtful way for the missions of its future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis gives us an opportunity to foundationally rebuild the base for the Air Force\u2019s next generation of warfighting,\u201d said Lt. Col. Christopher Conover, director of the program management office in charge of rebuilding Offutt, in a July 24 interview.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flooding began to overwhelm Offutt on March 15, 2019, forcing the base to evacuate nine aircraft. About 700 airmen filled 235,000 sandbags in a valiant, but ultimately unsuccessful, effort to hold the waters back. About one-third of the base, including 3,000 feet of runway, was flooded by 720 million gallons of water infested with raw sewage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">About 3,200 personnel were driven out of their workspaces. Those service members and employees are still in temporary workspaces \u2014 primarily the 80-year-old Glenn L. Martin-Nebraska Bomber Plant, which produced B-29s during World War II, including the Enola Gay and Bockscar bombers that dropped the atomic bombs on Japan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ultimately, 137 facilities \u2014 everything from full-fledged buildings to structures as small as generators, hydrants or guard houses \u2014 were damaged in the flood. About 60 buildings were deemed unsalvageable and slated for destruction. About 1.2 million square feet of work space \u2014 including 118,000 square feet of SCIF, or secure, compartmented information facilities, space for handling highly classified material \u2014 was destroyed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The base\u2019s reconstruction effort \u2014 which the Air Force said would cost $420 million, plus another $234 million to replace three destroyed simulators \u2014 will likely not be done for six more years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But, Conover said, work is already well under way \u2014 and the base is taking the opportunity to rethink how Offutt is structured and find more efficient ways to do business.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As Offutt plans its reconstruction, it\u2019s aiming for a much more well-thought-out layout, Conover said. The base is planning eight campuses, with 26 new facilities, that will group similar missions together: most importantly, nuclear command and control alert forces, but also satellite communications; multi-domain operations supporting signals intelligence missions; security forces; logistics; flightline operations. including fuels, liquid oxygen and maintenance; and the base lake recreation facilities.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" src=\"\/wp-content\/uploads\/2026\/08\/Offutt-flooding.jpg.jpg\" alt=\"\" class=\"wp-image-28238\" srcset=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-flooding.jpg.jpg 960w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-flooding.jpg.jpg?resize=300,225 300w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-flooding.jpg.jpg?resize=768,576 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><figcaption class=\"wp-element-caption\">Floodwaters from the Missouri River overtook a large portion of the airfield at Offutt Air Force Base in Nebraska over the weekend. At least nine aircraft were evacuated. (Air Force)<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Another campus will handle an emergency power micro-grid, with three interconnected power stations across the base, to provide backup power to critical facilities during power outages. Conover said this is crucial, because all of Offutt\u2019s backup generators were destroyed in the flood.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Offutt began planning these new campuses seven months after the flood. The base has now finished the planning phase, and has moved on to the design phase. Logistics is the easiest to design \u2014 using practically an off-the-shelf plan \u2014 and is the furthest along, he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But others will be more complex and take longer. The multi-domain operations campus, for example, will start being designed this October and will likely take an entire year to finish. Construction on the multi-domain campus is expected to begin in January 2022, and finish in July 2026, he said.<\/p>\n\n\n\t<aside class=\"smg-interstitial-link wp-block-smg-interstitial-link\">\n\t\t<a href=\"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2019\/03\/21\/waters-recede-from-offutt-flightline-as-flood-recovery-continues\/\" class=\"smg-interstitial-link__inner\">\n\t\t\t\t\t\t\t<div class=\"smg-interstitial-link__media\">\n\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"157\" src=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Rivet-Joints.JPG.jpg?w=300\" class=\"smg-interstitial-link__image wp-post-image\" alt=\"\" \/>\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"smg-interstitial-link__content\">\n\t\t\t\t<span class=\"smg-interstitial-link__kicker\">Related<\/span>\n\t\t\t\t<h3 class=\"smg-interstitial-link__title\">Waters recede from Offutt flightline as flood recovery continues<\/h3>\n\t\t\t\t\t\t\t\t\t<p class=\"smg-interstitial-link__excerpt\">The last waters flooding the 2-mile-long flightline at Offutt receded Wednesday, and engineers have entered the first of 30 flooded buildings.<\/p>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/a>\n\t<\/aside>\n\t\n\n\n<p class=\"wp-block-paragraph\">The earliest any construction will begin will be around April 2021, after the demolition and fill dirt and utility work is done, Conover said. The environmental assessments required before demolition can begin are expected to be finished this September.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But Offutt\u2019s mission had to go on, flood or no flood, and it needed to find space for 3,200 displaced personnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Martin bomber plant, also known as Building D, had office space that hadn\u2019t been used for more than a decade. So Offutt renovated some of that building\u2019s space, and started putting the bulk of the 3,200 people there.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, that\u2019s just a stopgap solution, not a long-term answer, Conover said. As Offutt has methodically worked through the flood-damaged hangars and offices to refurbish them, it has moved people back, bit by bit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, people have gradually been moving back into the Bennie L. Davis Maintenance Facility, which is the main maintenance hub for Offutt\u2019s RC-135 fleet. Conover hopes the Davis building will be finished by the end of the year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Offutt is also preparing for the next floods. The Army Corps of Engineers has repaired all the levees that were breached or damaged by last year\u2019s flood, Conover said. And in April, the base began working on raising the levees to the 100-year flood level, or three feet, he said. That $35 million effort \u2014 which was originally scheduled to begin last year, a few weeks after the flood struck \u2014 should be finished by December, he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work is also under way to line the Missouri River, as well as the Platte River that serves as its tributary, Conover said.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"6016\" height=\"4016\" src=\"\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg\" alt=\"\" class=\"wp-image-50890\" srcset=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg 6016w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg?resize=300,200 300w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg?resize=768,513 768w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg?resize=1024,684 1024w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg?resize=1536,1025 1536w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/5337622.jpg.jpg?resize=2048,1367 2048w\" sizes=\"auto, (max-width: 6016px) 100vw, 6016px\" \/><figcaption class=\"wp-element-caption\">Arial photography of Offutt Air Force Base, Nebraska, taken March 17. One-third of Offutt Air Force Base, Nebraska, was under water after the Missouri River flooded. (Tech. Sgt. Rachelle Blake\/ U.S. Army)<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Congress ordered Offutt to build its new facilities above the 100-year floodplain. That will mean trucking in 673,000 cubic yards of fill dirt to bring the new mission-critical facilities up three feet above the 100-year flood level, and non-mission critical facilities two feet above that level.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But Offutt is not expecting a repeat of the massive, unprecedented flooding, which was caused by a a combination of unique conditions, Conover said. Record snow and low temperatures, which froze the ground, rivers and tributaries, quickly gave way to rising temperatures and then a \u201cbomb cyclone\u201d struck, dumping up to eight inches of rain in the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe feel that there were very specific climatic variables that uniquely aligned that caused this 500-year flood,\u201d Conover said. \u201cSo a lot of people are worried about flooding [on that scale again]. We\u2019re not.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Offutt is also working to restore buildings that were flooded, but not so badly damaged that they couldn\u2019t be saved. Contractors are now working to gut and dry salvageable facilities such as some flooded hangars and Tennant Hall \u2014 an eight-year-old building that formerly housed the 97th Intelligence Squadron and served as a SCIF.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Congress gave Offutt permission to keep the relatively new building. But because Tennant Hall sits in the flood plain and can\u2019t be raised, the base will make its first floor \u201csacrificial\u201d and accept that it will be flooded from time to time. However, this means it will no longer be able to be a SCIF.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contractors are putting in new walls and utilities to allow Tennant Hall to take on its new missions, including the WC-135 Constant Phoenix nuke sniffer program and anti-drug efforts, as well as warehouse space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Offutt\u2019s runway was given the all-clear after the waters covering 3,000 feet of flightline receded, without causing major damage. But, Conover said, it is still the oldest runway in the Air Force, and already had plenty of problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So the base is preparing to shut the runway down, tear it out completely, and replace it, Conover said. Offutt will move its mission operations to Lincoln, Nebraska, while the runway is redone. This was already in the works before the flood happened, he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Three RC-135 Rivet Joint simulators \u2014 which recreate the entire interior of those signals intelligence aircraft \u2014 were also lost in the flood, with a price tag of $234 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Air Force\u2019s program manager running the simulators, Big Safari, salvaged and repurposed what they could from the flood wreckage, but most of it was shot. So Offutt cobbled together one working simulator out of spare parts scrounged from the depot in Texas and forward operating locations worldwide, as well as U.K. partners.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But while that \u201cband-aid solution\u201d worked to get operations back up and running, Conover said, it\u2019s not ideal. Big Safari is designing and building the next generation of simulators, which could start being installed next spring.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.<\/p>\n","protected":false},"author":7,"featured_media":50881,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_canonical":"","_acf":"","_yoast_wpseo_primary_category":67,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_smg_distribution_targets":{"2":{"categories":["your-military","news","left-column","home"],"primary_category":"your-military"}}},"categories":[101,24,88,16,26,67],"tags":[],"coauthors":[3320],"class_list":["post-25133","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-news-roundup","category-home","category-left-column","category-news","category-newsletters","category-your-air-force"],"acf":{"subheadline":"","legacy_arc_id":"LSJORFYG55EQ5CHA7JLPHQ3S34","arc_canonical_url":"\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/","remove_feature_photo":false,"is_sponsored":false,"subtype":"","redirect_url":"","disable_inline_ads":false,"native_logo_pretext":"Presented By:"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>After massive flood, Offutt looks to build a better base - Air Force TImes<\/title>\n<meta name=\"description\" content=\"Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"After massive flood, Offutt looks to build a better base\" \/>\n<meta property=\"og:description\" content=\"Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/\" \/>\n<meta property=\"og:site_name\" content=\"Air Force TImes\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-07T20:23:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-07T20:42:54+00:00\" \/>\n<meta name=\"author\" content=\"Stephen Losey\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Stephen Losey\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\n\t    \"@context\": \"https:\\\/\\\/schema.org\",\n\t    \"@graph\": [\n\t        {\n\t            \"@type\": \"Article\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#article\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/\"\n\t            },\n\t            \"author\": {\n\t                \"name\": \"migration\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\"\n\t            },\n\t            \"headline\": \"After massive flood, Offutt looks to build a better base\",\n\t            \"datePublished\": \"2020-08-07T20:23:35+00:00\",\n\t            \"dateModified\": \"2026-08-07T20:42:54+00:00\",\n\t            \"mainEntityOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/\"\n\t            },\n\t            \"wordCount\": 1375,\n\t            \"commentCount\": 0,\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#organization\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Offutt-Bennie-Davis.jfif_.jpg\",\n\t            \"articleSection\": [\n\t                \"Daily News Roundup\",\n\t                \"Home\",\n\t                \"Left Column\",\n\t                \"News\",\n\t                \"Newsletters\",\n\t                \"Your Air Force\"\n\t            ],\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"CommentAction\",\n\t                    \"name\": \"Comment\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#respond\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebPage\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/\",\n\t            \"name\": \"After massive flood, Offutt looks to build a better base - Air Force TImes\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#website\"\n\t            },\n\t            \"primaryImageOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#primaryimage\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Offutt-Bennie-Davis.jfif_.jpg\",\n\t            \"datePublished\": \"2020-08-07T20:23:35+00:00\",\n\t            \"dateModified\": \"2026-08-07T20:42:54+00:00\",\n\t            \"description\": \"Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.\",\n\t            \"breadcrumb\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#breadcrumb\"\n\t            },\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"ReadAction\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"ImageObject\",\n\t            \"inLanguage\": \"en-US\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#primaryimage\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Offutt-Bennie-Davis.jfif_.jpg\",\n\t            \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Offutt-Bennie-Davis.jfif_.jpg\"\n\t        },\n\t        {\n\t            \"@type\": \"BreadcrumbList\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/2020\\\/08\\\/07\\\/after-massive-floods-offutt-looks-to-build-a-better-base\\\/#breadcrumb\",\n\t            \"itemListElement\": [\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 1,\n\t                    \"name\": \"Home\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/\",\n\t                    \"ad_zone\": \"home\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 2,\n\t                    \"name\": \"Your Air Force\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/news\\\/your-air-force\\\/\",\n\t                    \"ad_zone\": \"your-air-force\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 3,\n\t                    \"name\": \"After massive flood, Offutt looks to build a better base\"\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebSite\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#website\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/\",\n\t            \"name\": \"Air Force TImes\",\n\t            \"description\": \"Independent News For Airmen | Air Force Times\",\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#organization\"\n\t            },\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"SearchAction\",\n\t                    \"target\": {\n\t                        \"@type\": \"EntryPoint\",\n\t                        \"urlTemplate\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/?s={search_term_string}\"\n\t                    },\n\t                    \"query-input\": {\n\t                        \"@type\": \"PropertyValueSpecification\",\n\t                        \"valueRequired\": true,\n\t                        \"valueName\": \"search_term_string\"\n\t                    }\n\t                }\n\t            ],\n\t            \"inLanguage\": \"en-US\"\n\t        },\n\t        {\n\t            \"@type\": \"Organization\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#organization\",\n\t            \"name\": \"Air Force TImes\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/\",\n\t            \"logo\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\n\t                \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/air-logo-white.png\",\n\t                \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/air-logo-white.png\",\n\t                \"caption\": \"Air Force TImes\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"\n\t            }\n\t        },\n\t        {\n\t            \"@type\": \"Person\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\",\n\t            \"name\": \"migration\",\n\t            \"image\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec\",\n\t                \"url\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"contentUrl\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"caption\": \"migration\"\n\t            },\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/airforcetimes\\\/author\\\/migration\\\/\"\n\t        }\n\t    ]\n\t}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"After massive flood, Offutt looks to build a better base - Air Force TImes","description":"Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/","og_locale":"en_US","og_type":"article","og_title":"After massive flood, Offutt looks to build a better base","og_description":"Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.","og_url":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/","og_site_name":"Air Force TImes","article_published_time":"2020-08-07T20:23:35+00:00","article_modified_time":"2026-08-07T20:42:54+00:00","author":"Stephen Losey","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Stephen Losey","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#article","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/"},"author":{"name":"migration","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1"},"headline":"After massive flood, Offutt looks to build a better base","datePublished":"2020-08-07T20:23:35+00:00","dateModified":"2026-08-07T20:42:54+00:00","mainEntityOfPage":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/"},"wordCount":1375,"commentCount":0,"publisher":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#organization"},"image":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-Bennie-Davis.jfif_.jpg","articleSection":["Daily News Roundup","Home","Left Column","News","Newsletters","Your Air Force"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/","url":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/","name":"After massive flood, Offutt looks to build a better base - Air Force TImes","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#primaryimage"},"image":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-Bennie-Davis.jfif_.jpg","datePublished":"2020-08-07T20:23:35+00:00","dateModified":"2026-08-07T20:42:54+00:00","description":"Rebuilding at Offutt, which was heavily damaged by a 500-year flood in April 2019, will probably not be finished until 2026.","breadcrumb":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#primaryimage","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-Bennie-Davis.jfif_.jpg","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-Bennie-Davis.jfif_.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/2020\/08\/07\/after-massive-floods-offutt-looks-to-build-a-better-base\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/one.sightlinemg.com\/airforcetimes\/","ad_zone":"home"},{"@type":"ListItem","position":2,"name":"Your Air Force","item":"https:\/\/one.sightlinemg.com\/airforcetimes\/news\/your-air-force\/","ad_zone":"your-air-force"},{"@type":"ListItem","position":3,"name":"After massive flood, Offutt looks to build a better base"}]},{"@type":"WebSite","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#website","url":"https:\/\/one.sightlinemg.com\/airforcetimes\/","name":"Air Force TImes","description":"Independent News For Airmen | Air Force Times","publisher":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/one.sightlinemg.com\/airforcetimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#organization","name":"Air Force TImes","url":"https:\/\/one.sightlinemg.com\/airforcetimes\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#\/schema\/logo\/image\/","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/air-logo-white.png","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/air-logo-white.png","caption":"Air Force TImes"},"image":{"@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/one.sightlinemg.com\/airforcetimes\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1","name":"migration","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec","url":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","caption":"migration"},"url":"https:\/\/one.sightlinemg.com\/airforcetimes\/author\/migration\/"}]}},"jetpack_featured_media_url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/Offutt-Bennie-Davis.jfif_.jpg","jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Air Force TImes","distributor_original_site_url":"https:\/\/one.sightlinemg.com\/airforcetimes","push-errors":false,"_links":{"self":[{"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/posts\/25133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/comments?post=25133"}],"version-history":[{"count":2,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/posts\/25133\/revisions"}],"predecessor-version":[{"id":86369,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/posts\/25133\/revisions\/86369"}],"wp:attachment":[{"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/media?parent=25133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/categories?post=25133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/tags?post=25133"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/airforcetimes\/wp-json\/wp\/v2\/coauthors?post=25133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}