{"id":50786,"date":"2025-01-14T14:39:33","date_gmt":"2025-01-14T14:39:33","guid":{"rendered":"https:\/\/one.sightlinemg.com\/defensenews\/uncategorized\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/"},"modified":"2026-08-08T20:02:07","modified_gmt":"2026-08-08T20:02:07","slug":"navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years","status":"publish","type":"post","link":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/","title":{"rendered":"Navy shipbuilding plan would cost $1 trillion over the next 30 years"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">For the U.S. Navy to achieve a proposed plan to expand its fleet of battle force ships, the service would need to spend $40.1 billion on shipbuilding every year through 2054, for a total of more than $1 trillion, according to <a href=\"https:\/\/www.cbo.gov\/publication\/61155\" target=\"_blank\">new analysis<\/a> from the Congressional Budget Office.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Over the next 30 years, the Navy wants to grow its fleet of battle force ships to 381 to face swelling global threats, according to the service\u2019s most recent proposal. There are currently 295 in the fleet, and that number is expected to drop to 283 ships in 2027, when the Navy is planning to retire 13 more ships than it will commission.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe pace of shipbuilding would be fastest in the early 2030s, reflecting the service\u2019s desire to increase the size of the fleet as quickly as feasible,\u201d the Congressional Budget Office said of the Navy\u2019s proposal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The office, which provides cost estimates of proposed legislation, estimated the plan for the future fleet would require Congress to fund the Navy at levels 46% higher than the average annual funding the service has received over the past five years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By 2054, the Navy would need a total yearly budget of $340 billion \u2014 one-third more than its $255 billion budget today. About $40 billion of that increase would be spent on continued shipbuilding, while the remaining $45 billion would go toward the costs of operating and maintaining the existing ships and purchasing weapons for them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The estimates from the Congressional Budget Office came in 8% to 16% higher than the Navy\u2019s own projections. The office said it took into account that some ships have taken longer and been more difficult to build than the Navy has previously anticipated, and the designs have proved more complicated to complete. The Navy\u2019s cost estimates for some ships were also unrealistically low, the analysis says.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Congressional Budget Office described the cost of the shipbuilding plan as high when compared with both recent funding levels and historical standards. Funding for ship construction has climbed in the past 10 years, reaching the highest levels since former President Ronald Regan pursued the idea of a 600-ship Navy in the 1980s, the office said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSince 2015, lawmakers have appropriated an average of $2.5 billion more per year for shipbuilding than the president has requested, partly because of concerns that the fleet is too small to perform all of its missions,\u201d the analysis says.<\/p>\n\n\n\t<aside class=\"smg-interstitial-link wp-block-smg-interstitial-link\">\n\t\t<a href=\"https:\/\/one.sightlinemg.com\/militarytimes\/news\/your-military\/2024\/08\/11\/navy-warship-production-in-worst-state-in-25-years-whats-behind-it\/\" class=\"smg-interstitial-link__inner\">\n\t\t\t\t\t\t\t<div class=\"smg-interstitial-link__media\">\n\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/AP19173575936338.jpg.jpg?w=300\" class=\"smg-interstitial-link__image wp-post-image\" alt=\"\" \/>\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"smg-interstitial-link__content\">\n\t\t\t\t<span class=\"smg-interstitial-link__kicker\">Related<\/span>\n\t\t\t\t<h3 class=\"smg-interstitial-link__title\">Navy warship production in worst state in 25 years. What\u2019s behind it?<\/h3>\n\t\t\t\t\t\t\t\t\t<p class=\"smg-interstitial-link__excerpt\">Labor shortages are one of many challenges that have led to backlogs in ship production at a time when the Navy faces expanding global threats.<\/p>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/a>\n\t<\/aside>\n\t\n\n\n<p class=\"wp-block-paragraph\">In order to make plans for the future fleet a reality, the country\u2019s shipyards would also need to drastically increase their productivity from what they\u2019ve achieved over the past decade, the Congressional Budget Office reported.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Navy shipbuilding is in \u201ca terrible state\u201d \u2014 the worst in a quarter century, Eric Labs, a longtime naval analyst at the Congressional Budget Office, <a href=\"https:\/\/www.militarytimes.com\/news\/your-navy\/2024\/08\/11\/navy-warship-production-in-worst-state-in-25-years-whats-behind-it\/\" target=\"_blank\">told The Associated Press in August<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cI feel alarmed,\u201d he said. \u201cI don\u2019t see a fast, easy way to get out of this problem. It\u2019s taken us a long time to get into it.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The shipbuilding industry has faced cost overruns and labor shortages that have set the production of some ships <a href=\"https:\/\/www.defensenews.com\/naval\/2022\/03\/18\/carrier-george-washington-running-more-than-a-year-behind-schedule\/\" target=\"_blank\">years behind schedule<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That was the case with the Nimitz-class aircraft carrier George Washington, which began its midlife refueling in August 2017. The refueling occurs halfway through a carrier\u2019s 50-year service life to refuel the nuclear power reactor and conduct significant repairs and upgrades. While a refueling typically lasts four years, Newport News Shipbuilding didn\u2019t complete the work until nearly six years later, in May 2023, according to a Navy statement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The carrier underwent inspections and certifications for 10 months, and in November it arrived in Yokosuka, Japan, as the <a href=\"https:\/\/www.militarytimes.com\/news\/your-navy\/2024\/11\/25\/uss-george-washington-returns-to-japan-after-nearly-a-decade-away\/\" target=\"_blank\">United States\u2019 only forward-deployed aircraft carrier<\/a>, the Navy said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under the Navy\u2019s newest proposal for its fleet, aircraft carrier construction would remain fairly steady, the Congressional Budget Office said. But the tonnage of submarines, surface combatants and amphibious warfare ships under construction from 2030 to 2054 would be 50% higher on average than it is today.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Navy&#8217;s plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation&#8217;s shipyards.<\/p>\n","protected":false},"author":7,"featured_media":112994,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_canonical":"","_acf":"","_yoast_wpseo_primary_category":16,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_smg_distribution_targets":[]},"categories":[160,29,16,36,103],"tags":[],"coauthors":[3496],"class_list":["post-50786","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-news-roundup","category-digital-show-dailies","category-naval","category-newsletters","category-surface-navy-association"],"acf":{"subheadline":"","legacy_arc_id":"HDQQURLYRFF7XGV2SIL6CBIHGA","arc_canonical_url":"\/news\/your-navy\/2025\/01\/08\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/","remove_feature_photo":false,"is_sponsored":false,"subtype":"","redirect_url":"","disable_inline_ads":false,"native_logo_pretext":"Presented By:"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Navy shipbuilding plan would cost $1 trillion over the next 30 years - Defense News<\/title>\n<meta name=\"description\" content=\"The Navy&#039;s plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation&#039;s shipyards.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navy shipbuilding plan would cost $1 trillion over the next 30 years\" \/>\n<meta property=\"og:description\" content=\"The Navy&#039;s plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation&#039;s shipyards.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/\" \/>\n<meta property=\"og:site_name\" content=\"Defense News\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-14T14:39:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-08T20:02:07+00:00\" \/>\n<meta name=\"author\" content=\"Nikki Wentling\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nikki Wentling\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\n\t    \"@context\": \"https:\\\/\\\/schema.org\",\n\t    \"@graph\": [\n\t        {\n\t            \"@type\": \"Article\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#article\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/\"\n\t            },\n\t            \"author\": {\n\t                \"name\": \"migration\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\"\n\t            },\n\t            \"headline\": \"Navy shipbuilding plan would cost $1 trillion over the next 30 years\",\n\t            \"datePublished\": \"2025-01-14T14:39:33+00:00\",\n\t            \"dateModified\": \"2026-08-08T20:02:07+00:00\",\n\t            \"mainEntityOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/\"\n\t            },\n\t            \"wordCount\": 657,\n\t            \"commentCount\": 0,\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/AP24198733068122.jpg.jpg\",\n\t            \"articleSection\": [\n\t                \"Daily News Roundup\",\n\t                \"Digital Show Dailies\",\n\t                \"Naval\",\n\t                \"Newsletters\",\n\t                \"Surface Navy\"\n\t            ],\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"CommentAction\",\n\t                    \"name\": \"Comment\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#respond\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebPage\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/\",\n\t            \"name\": \"Navy shipbuilding plan would cost $1 trillion over the next 30 years - Defense News\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\"\n\t            },\n\t            \"primaryImageOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#primaryimage\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/AP24198733068122.jpg.jpg\",\n\t            \"datePublished\": \"2025-01-14T14:39:33+00:00\",\n\t            \"dateModified\": \"2026-08-08T20:02:07+00:00\",\n\t            \"description\": \"The Navy's plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation's shipyards.\",\n\t            \"breadcrumb\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#breadcrumb\"\n\t            },\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"ReadAction\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"ImageObject\",\n\t            \"inLanguage\": \"en-US\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#primaryimage\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/AP24198733068122.jpg.jpg\",\n\t            \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/AP24198733068122.jpg.jpg\"\n\t        },\n\t        {\n\t            \"@type\": \"BreadcrumbList\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2025\\\/01\\\/14\\\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\\\/#breadcrumb\",\n\t            \"itemListElement\": [\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 1,\n\t                    \"name\": \"Home\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t                    \"ad_zone\": \"home\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 2,\n\t                    \"name\": \"Naval\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/\",\n\t                    \"ad_zone\": \"naval\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 3,\n\t                    \"name\": \"Navy shipbuilding plan would cost $1 trillion over the next 30 years\"\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebSite\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"name\": \"Defense News\",\n\t            \"description\": \"Covering the politics, business and technology of defense | Defense News\",\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"SearchAction\",\n\t                    \"target\": {\n\t                        \"@type\": \"EntryPoint\",\n\t                        \"urlTemplate\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/?s={search_term_string}\"\n\t                    },\n\t                    \"query-input\": {\n\t                        \"@type\": \"PropertyValueSpecification\",\n\t                        \"valueRequired\": true,\n\t                        \"valueName\": \"search_term_string\"\n\t                    }\n\t                }\n\t            ],\n\t            \"inLanguage\": \"en-US\"\n\t        },\n\t        {\n\t            \"@type\": \"Organization\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\",\n\t            \"name\": \"Defense News\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"logo\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\n\t                \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"caption\": \"Defense News\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\"\n\t            }\n\t        },\n\t        {\n\t            \"@type\": \"Person\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\",\n\t            \"name\": \"migration\",\n\t            \"image\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec\",\n\t                \"url\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"contentUrl\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"caption\": \"migration\"\n\t            },\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/author\\\/migration\\\/\"\n\t        }\n\t    ]\n\t}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Navy shipbuilding plan would cost $1 trillion over the next 30 years - Defense News","description":"The Navy's plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation's shipyards.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Navy shipbuilding plan would cost $1 trillion over the next 30 years","og_description":"The Navy's plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation's shipyards.","og_url":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/","og_site_name":"Defense News","article_published_time":"2025-01-14T14:39:33+00:00","article_modified_time":"2026-08-08T20:02:07+00:00","author":"Nikki Wentling","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Nikki Wentling","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#article","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/"},"author":{"name":"migration","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1"},"headline":"Navy shipbuilding plan would cost $1 trillion over the next 30 years","datePublished":"2025-01-14T14:39:33+00:00","dateModified":"2026-08-08T20:02:07+00:00","mainEntityOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/"},"wordCount":657,"commentCount":0,"publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/AP24198733068122.jpg.jpg","articleSection":["Daily News Roundup","Digital Show Dailies","Naval","Newsletters","Surface Navy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/","url":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/","name":"Navy shipbuilding plan would cost $1 trillion over the next 30 years - Defense News","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#primaryimage"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/AP24198733068122.jpg.jpg","datePublished":"2025-01-14T14:39:33+00:00","dateModified":"2026-08-08T20:02:07+00:00","description":"The Navy's plan for its future fleet would require $1 trillion and a drastic increase in productivity at the nation's shipyards.","breadcrumb":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#primaryimage","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/AP24198733068122.jpg.jpg","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/AP24198733068122.jpg.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2025\/01\/14\/navy-shipbuilding-plan-would-cost-1-trillion-over-the-next-30-years\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/one.sightlinemg.com\/defensenews\/","ad_zone":"home"},{"@type":"ListItem","position":2,"name":"Naval","item":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/","ad_zone":"naval"},{"@type":"ListItem","position":3,"name":"Navy shipbuilding plan would cost $1 trillion over the next 30 years"}]},{"@type":"WebSite","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website","url":"https:\/\/one.sightlinemg.com\/defensenews\/","name":"Defense News","description":"Covering the politics, business and technology of defense | Defense News","publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/one.sightlinemg.com\/defensenews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization","name":"Defense News","url":"https:\/\/one.sightlinemg.com\/defensenews\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","caption":"Defense News"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1","name":"migration","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec","url":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","caption":"migration"},"url":"https:\/\/one.sightlinemg.com\/defensenews\/author\/migration\/"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Defense News","distributor_original_site_url":"https:\/\/one.sightlinemg.com\/defensenews","push-errors":false,"jetpack_featured_media_url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/AP24198733068122.jpg.jpg","_links":{"self":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/50786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/comments?post=50786"}],"version-history":[{"count":2,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/50786\/revisions"}],"predecessor-version":[{"id":82439,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/50786\/revisions\/82439"}],"wp:attachment":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/media?parent=50786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/categories?post=50786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/tags?post=50786"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/coauthors?post=50786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}