{"id":55960,"date":"2016-02-18T15:08:54","date_gmt":"2016-02-18T15:08:54","guid":{"rendered":"https:\/\/one.sightlinemg.com\/defensenews\/uncategorized\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/"},"modified":"2026-08-08T00:10:02","modified_gmt":"2026-08-08T00:10:02","slug":"sigar-afghan-mod-headquarters-costs-triple-original-estimate","status":"publish","type":"post","link":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/","title":{"rendered":"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">WASHINGTON\u00a0\u2014\u00a0The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Because of &#8220;problems with the contract from the outset,&#8221; John Sopko calculated the cost to finish the building rose to $154.7 million and took well over the 18 months expected to finish the construction. Sopko attributes the balooned price tag to the Afghan National Army refusing to let the US contractor, ITSI, have access to the site for &#8220;about a year.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And &#8220;other delays, such as weather, security and funding issues, emerged,&#8221; a<a href=\"http:\/\/ec.militarytimes.com\/static\/pdfs\/SIGAR-16-16-IP.pdf\"> SIGAR report released Thursday<\/a> states.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ultimately, the construction took almost five years longer to complete than the anticipated 18 months, Sopko wrote.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Combined Security Transition Command-Afghanistan (CSTC-A) transferred the building to the MoD on Dec.28, 2015, the report noted, but as of Jan. 7 the building was not fully occupied.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SIGAR found the building was &#8220;well-built&#8221; but there were still &#8220;several construction issues,&#8221; including issues that could affect the building&#8217;s ability to withstand an earthquake or a significant amount of\u00a0rain.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;These include issues with building separation joints needed for seismic activity, lateral bracing of equipment needed for seismic activity, inadequate roof drains to remove storm water, and stairway handrails that were installed below the required height,&#8221; the report said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The commanding general of CSTC-A should assess the building&#8217;s structural integrity related to the separation joints and decide whether there is a need to install further bracing elements to strengthen the building&#8217;s ability to hold up to seismic activity, Sopko said, as well as install better roof drainage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Email: <a href=\"mailto:jjudson@defensenews.com\">jjudson@defensenews.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Twitter: <a href=\"https:\/\/twitter.com\/JenJudson\">@JenJudson<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.<\/p>\n","protected":false},"author":7,"featured_media":66209,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_canonical":"","_acf":"","_yoast_wpseo_primary_category":19,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_smg_distribution_targets":[]},"categories":[19],"tags":[],"coauthors":[3330],"class_list":["post-55960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pentagon"],"acf":{"subheadline":"","legacy_arc_id":"Z3XWUELB5BAMHKFJAUR2D4QPBM","arc_canonical_url":"\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/","remove_feature_photo":false,"is_sponsored":false,"subtype":"","redirect_url":"","disable_inline_ads":false,"native_logo_pretext":"Presented By:"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate - Defense News<\/title>\n<meta name=\"description\" content=\"The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate\" \/>\n<meta property=\"og:description\" content=\"The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/\" \/>\n<meta property=\"og:site_name\" content=\"Defense News\" \/>\n<meta property=\"article:published_time\" content=\"2016-02-18T15:08:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-08T00:10:02+00:00\" \/>\n<meta name=\"author\" content=\"Jen Judson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jen Judson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\n\t    \"@context\": \"https:\\\/\\\/schema.org\",\n\t    \"@graph\": [\n\t        {\n\t            \"@type\": \"Article\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#article\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/\"\n\t            },\n\t            \"author\": {\n\t                \"name\": \"migration\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\"\n\t            },\n\t            \"headline\": \"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate\",\n\t            \"datePublished\": \"2016-02-18T15:08:54+00:00\",\n\t            \"dateModified\": \"2026-08-08T00:10:02+00:00\",\n\t            \"mainEntityOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/\"\n\t            },\n\t            \"wordCount\": 283,\n\t            \"commentCount\": 0,\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/635913867375671239-2062020jpg.jpg\",\n\t            \"articleSection\": [\n\t                \"Pentagon\"\n\t            ],\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"CommentAction\",\n\t                    \"name\": \"Comment\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#respond\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebPage\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/\",\n\t            \"name\": \"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate - Defense News\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\"\n\t            },\n\t            \"primaryImageOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#primaryimage\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/635913867375671239-2062020jpg.jpg\",\n\t            \"datePublished\": \"2016-02-18T15:08:54+00:00\",\n\t            \"dateModified\": \"2026-08-08T00:10:02+00:00\",\n\t            \"description\": \"The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.\",\n\t            \"breadcrumb\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#breadcrumb\"\n\t            },\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"ReadAction\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"ImageObject\",\n\t            \"inLanguage\": \"en-US\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#primaryimage\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/635913867375671239-2062020jpg.jpg\",\n\t            \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/635913867375671239-2062020jpg.jpg\"\n\t        },\n\t        {\n\t            \"@type\": \"BreadcrumbList\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/2016\\\/02\\\/18\\\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\\\/#breadcrumb\",\n\t            \"itemListElement\": [\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 1,\n\t                    \"name\": \"Home\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t                    \"ad_zone\": \"home\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 2,\n\t                    \"name\": \"Pentagon\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/pentagon\\\/\",\n\t                    \"ad_zone\": \"pentagon\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 3,\n\t                    \"name\": \"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate\"\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebSite\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"name\": \"Defense News\",\n\t            \"description\": \"Covering the politics, business and technology of defense | Defense News\",\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"SearchAction\",\n\t                    \"target\": {\n\t                        \"@type\": \"EntryPoint\",\n\t                        \"urlTemplate\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/?s={search_term_string}\"\n\t                    },\n\t                    \"query-input\": {\n\t                        \"@type\": \"PropertyValueSpecification\",\n\t                        \"valueRequired\": true,\n\t                        \"valueName\": \"search_term_string\"\n\t                    }\n\t                }\n\t            ],\n\t            \"inLanguage\": \"en-US\"\n\t        },\n\t        {\n\t            \"@type\": \"Organization\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\",\n\t            \"name\": \"Defense News\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"logo\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\n\t                \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"caption\": \"Defense News\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\"\n\t            }\n\t        },\n\t        {\n\t            \"@type\": \"Person\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\",\n\t            \"name\": \"migration\",\n\t            \"image\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec\",\n\t                \"url\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"contentUrl\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"caption\": \"migration\"\n\t            },\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/author\\\/migration\\\/\"\n\t        }\n\t    ]\n\t}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate - Defense News","description":"The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate","og_description":"The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.","og_url":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/","og_site_name":"Defense News","article_published_time":"2016-02-18T15:08:54+00:00","article_modified_time":"2026-08-08T00:10:02+00:00","author":"Jen Judson","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jen Judson","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#article","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/"},"author":{"name":"migration","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1"},"headline":"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate","datePublished":"2016-02-18T15:08:54+00:00","dateModified":"2026-08-08T00:10:02+00:00","mainEntityOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/"},"wordCount":283,"commentCount":0,"publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/635913867375671239-2062020jpg.jpg","articleSection":["Pentagon"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/","url":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/","name":"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate - Defense News","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#primaryimage"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/635913867375671239-2062020jpg.jpg","datePublished":"2016-02-18T15:08:54+00:00","dateModified":"2026-08-08T00:10:02+00:00","description":"The five-story Afghan Ministry of Defense Headquarters in Kabul costs three times the original estimate of $48.7 million to build, the special inspector general for Afghanistan reconstruction has found.","breadcrumb":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#primaryimage","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/635913867375671239-2062020jpg.jpg","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/635913867375671239-2062020jpg.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/2016\/02\/18\/sigar-afghan-mod-headquarters-costs-triple-original-estimate\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/one.sightlinemg.com\/defensenews\/","ad_zone":"home"},{"@type":"ListItem","position":2,"name":"Pentagon","item":"https:\/\/one.sightlinemg.com\/defensenews\/pentagon\/","ad_zone":"pentagon"},{"@type":"ListItem","position":3,"name":"SIGAR: Afghan MoD Headquarters Costs Triple Original Estimate"}]},{"@type":"WebSite","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website","url":"https:\/\/one.sightlinemg.com\/defensenews\/","name":"Defense News","description":"Covering the politics, business and technology of defense | Defense News","publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/one.sightlinemg.com\/defensenews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization","name":"Defense News","url":"https:\/\/one.sightlinemg.com\/defensenews\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","caption":"Defense News"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1","name":"migration","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec","url":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","caption":"migration"},"url":"https:\/\/one.sightlinemg.com\/defensenews\/author\/migration\/"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Defense News","distributor_original_site_url":"https:\/\/one.sightlinemg.com\/defensenews","push-errors":false,"jetpack_featured_media_url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/635913867375671239-2062020jpg.jpg","_links":{"self":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/55960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/comments?post=55960"}],"version-history":[{"count":1,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/55960\/revisions"}],"predecessor-version":[{"id":55963,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/55960\/revisions\/55963"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/66209"}],"wp:attachment":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/media?parent=55960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/categories?post=55960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/tags?post=55960"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/coauthors?post=55960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}