{"id":65160,"date":"2023-09-07T06:00:00","date_gmt":"2023-09-07T06:00:00","guid":{"rendered":"https:\/\/one.sightlinemg.com\/defensenews\/uncategorized\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/"},"modified":"2026-08-08T00:59:19","modified_gmt":"2026-08-08T00:59:19","slug":"allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track","status":"publish","type":"post","link":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/","title":{"rendered":"Allies target early AUKUS milestones to keep 20-year plan on track"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><i>This is the second story of a three-part series. <\/i><a href=\"https:\/\/www.defensenews.com\/congress\/2023\/09\/05\/aukus-standoff-australia-uk-wait-on-congress-to-approve-pact\/\" target=\"_blank\"><i>Click here<\/i><\/a><i> to read the first, and <\/i><a href=\"https:\/\/www.defensenews.com\/naval\/2023\/09\/08\/the-us-navy-is-spending-billions-to-stabilize-vendors-will-it-work\/\" target=\"_blank\"><i>click here<\/i><\/a><i> to read the third.<\/i><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><i>Correction: A previous version of this story misidentified the origins of a propulsion system, which will include American and British technology.<\/i><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">WASHINGTON \u2014 It will take two decades for Australia to operate the nuclear-powered submarines <a href=\"https:\/\/www.defensenews.com\/naval\/2023\/03\/13\/leaders-unveil-a-circuitous-path-to-nuke-powered-australian-subs\/\" target=\"_blank\">designed and built under a new arrangement<\/a> with the United States and the United Kingdom, unveiled six months ago.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Even so, a flurry of activity meant to get the undertaking off the ground has already begun, and experts say it\u2019s critical to the program\u2019s long-term timeline that the three countries meet these initial goals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Australia, the U.K. and the U.S. \u2014 or AUKUS \u2014 have begun overhauling a submarine-industrial base in Western Australia; designing Australia\u2019s future attack submarine SSN-AUKUS, that will incorporate American and Australian technology into a British attack sub design; and eyeing investments in all three countries\u2019 submarine-industrial bases meant to make them more resilient and tightly interwoven.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThat\u2019s very much the vision,\u201d said Capt. Lincoln Reifsteck, the AUKUS integration and acquisition program manager, \u201cthat all three countries become stronger militarily, that we become stronger industrially, that all of us move forward together, and that those partnerships, those alliances, make us all better.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The countries in March laid out a three-phase plan to achieve these goals. Australia will host American and British submarines out of a base in Western Australia in 2027, helping maintainers there learn to support nuclear-powered vessels. The U.S. will then sell Australia three to five Virginia-class attack submarines in the early 2030s, allowing Australia to start crewing and operating its own interim fleet. Finally, Australia will field a fleet of attack subs specifically under AUKUS in the early 2040s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThese are aggressive timelines. They should be aggressive timelines; if you\u2019re going to provide your close partners a game-changing capability, you should do this as fast as possible and work as hard as possible to do that,\u201d Reifsteck told Defense News.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Two experts explained to Defense News these aggressive timelines are achievable, but said political pushback is likely the most significant potential obstacle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here\u2019s a look at the status of each phase, as well as how Congress is backing the trilateral effort.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\">The linchpin<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Australia is renovating facilities at its HMAS Stirling submarine base to ensure it\u2019s ready to host foreign subs by 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As many as four American Virginia-class subs and one British Astute-class sub will form Submarine Rotational Force-West. They will operate out of Stirling for several years at a time, and their crews will include Australian sailors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reifsteck said U.S. Indo-Pacific Command previously committed to sending American attack submarines to port visits in Australia once a year. With AUKUS in place, that will increase to two or more port calls to Stirling each year.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"3600\" height=\"1989\" src=\"\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg\" alt=\"\" class=\"wp-image-117826\" srcset=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg 3600w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg?resize=300,166 300w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg?resize=768,424 768w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg?resize=1024,566 1024w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg?resize=1536,849 1536w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1235304614.jpg.jpg?resize=2048,1132 2048w\" sizes=\"auto, (max-width: 3600px) 100vw, 3600px\" \/><figcaption class=\"wp-element-caption\">The Royal Australian Navy frigate HMAS Warramunga is berthed at HMAS Stirling on Aug. 11, 2021, in Garden Island, Australia. (CPOIS Damian Pawlenko\/Australian Defence Force via Getty Images)<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As Australian maintainers become qualified in U.S. Navy standards and procedures, they\u2019ll increasingly use the port visits to participate in small pierside maintenance activities, Reifsteck said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And as new facilities go up at Stirling to support the nuclear-powered Virginia-class and future AUKUS-class submarines, the port visits will allow for beta tests of the new facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reifsteck said the port visits can include drills for fires, hazardous material leaks and natural disasters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As the piers, maintenance facilities and training facilities get built, the workforce at Pearl Harbor Naval Shipyard in Hawaii will begin training their counterparts at Stirling on American procedures for maintenance and test events.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bryan Clark, director of the Center for Defense Concepts and Technology at Hudson Institute think tank, said training Australia\u2019s workforce on U.S. nuclear and submarine safety standards by 2027 would be a challenge, but noted there are ways to mitigate this to stay on schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If needed, Australian workers could start with repair tasks unrelated to the nuclear propulsion plant or so-called SUBSAFE components. These more sensitive repairs could be done by American workers in Australia, at repair facilities in Guam or Pearl Harbor, or using a submarine tender sent to Australia until the workforce at Stirling is fully trained.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\">Capacity concerns<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">The U.S. Navy will sell three to five Virginia-class submarines to Australia to give the ally an interim capability while the SSN-AUKUS undergoes construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But the state of America\u2019s submarine-industrial base has left some lawmakers uneasy about this piece of AUKUS. The U.S. Navy already has a shortfall of attack submarines, with 49 in the fleet instead of the 66 to 72 required by a 2021 force structure assessment. Those attack subs are also less prepared than the Navy wants, with 33% of the fleet undergoing or awaiting maintenance instead of the 20% the service expects.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"3000\" height=\"1687\" src=\"\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg\" alt=\"\" class=\"wp-image-117829\" srcset=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg 3000w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg?resize=300,169 300w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg?resize=768,432 768w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg?resize=1024,576 1024w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg?resize=1536,864 1536w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/SSN-AUKUS.jpg.jpg?resize=2048,1152 2048w\" sizes=\"auto, (max-width: 3000px) 100vw, 3000px\" \/><figcaption class=\"wp-element-caption\">A rendering of the SSN-AUKUS. (Business Wire)<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The submarine-industrial base plays a role in both problems. Suppliers are struggling to deliver parts on time, and delayed parts can throw off delicate production line schedules as well as delay maintenance for the in-service fleet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The U.S. government has invested $2.3 billion to strengthen the submarine-industrial base and has committed to spending $1.6 billion more \u2014 in addition to a $2.4 billion pledge specifically to bolster submarine sustainment. These combined efforts are flooding suppliers with money and workload, allowing them to invest in the people, facilities and processes to more efficiently produce more parts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rep. Joe Courtney, a Democrat whose Connecticut district includes the General Dynamics Electric Boat shipyard, wrote a July 27 memo to convince his colleagues that previous investments are making a difference and that continued spending will ensure the submarine sale to Australia won\u2019t hurt the American fleet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Still, Clark said, this phase is the most at risk of being skipped over.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIt is an open question whether Australia will still want to spend [$3 billion or more] per submarine on SSNs in that time frame, and the U.S. Congress may resist selling ships out of a small inventory of ready boats,\u201d he noted, saying it\u2019s possible the allies may ultimately bypass this interim fleet and wait for the arrival of SSN-AUKUS if both governments cannot overcome the political hurdles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The U.S. Navy acknowledges AUKUS will put additional strain on the industrial base. Still, it estimates the vendor base will be back on track building American submarines by 2028 and will have additional capacity in the 2030s when it sells submarines to Australia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reifsteck said Australia has very sophisticated manufacturing capabilities for certain kinds of parts and could take on work for the collective AUKUS nuclear sub supply system. The three navies are in talks with their sectors to match interests and needs as well as identify the best opportunities for Australian involvement in the collective supply base.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe\u2019ve started working with the Australians on how we certify our vendors, how we do our quality control, how we certify that a part can go onto our submarine, so that we can quickly identify where the best pilot activities are going to be,\u201d he said, with a goal to \u201cget those parts into Virginia [submarines] immediately and have that industrial base revved up\u201d to support Australia\u2019s Virginia-class and SSN-AUKUS subs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By the end of this decade, he added, Australian workers at HMAS Stirling could <a href=\"https:\/\/www.defensenews.com\/global\/asia-pacific\/2023\/03\/09\/in-aukus-navy-eyes-a-full-service-submarine-garage-in-asia-pacific\/\" target=\"_blank\">perform maintenance<\/a> on American submarines and install Australian-made repair parts, as the two countries merge their supply systems.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\">A brand new boat<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Though the first SSN-AUKUS boats won\u2019t hit the water for another 15 years, the design must be done by next year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.gov.uk\/government\/news\/british-led-design-chosen-for-aukus-submarine-project\" target=\"_blank\">A U.K. team is designing<\/a> SSN-AUKUS. Boats built in the U.K. by BAE Systems and Rolls-Royce will replace the Royal Navy\u2019s Astute-class submarines. Boats built in Australia, with some manufacturing assistance from companies in the U.K., will form the next-generation undersea fleet for the Royal Australian Navy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The nuclear propulsion system will leverage both British and American technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And the combat system and weapons systems will feature much American technology. In some cases, such as the MK 48 heavyweight torpedo, the Australian naval force already uses the American weapon and is familiar with its fire control system, making it an easy decision to include these in the SSN-AUKUS design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reifsteck said the British designers are still weighing a few major decisions about which technology to use from which country, seeking to pick the \u201cbest of breed\u201d from across their inventories.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then the U.K. will begin building its first boat later this decade. Australia will follow \u201cvery shortly thereafter,\u201d he added.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The U.K. production line will stay a bit ahead of its Australian counterpart, allowing the more experienced workforce to learn lessons about building this new class and share those with the Australian production line. The first U.K. boat should deliver in the late 2030s, and the first Australian boat in the early 2040s.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\">Near-term challenges<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Despite the early activity, roadblocks remain, particularly for lawmakers to address.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Courtney told Defense News a package of legislative proposals from the Defense and State departments have \u201creally given Congress a to-do list in terms of making AUKUS work.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The House Foreign Affairs Committee voted 48-0 in late July to support the sale of Virginia-class submarines to Australia. Despite the unanimous vote, there are lingering concerns about further shrinking the size of the American fleet due to this sale \u2014 though Courtney said he\u2019s optimistic the measure will be passed into law this year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There\u2019s also a change to the Defense Production Act that would allow suppliers in the U.K. and Australia to be considered \u201cdomestic sources\u201d of materials in the U.S. \u2014 a designation from which Canada benefits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And then there\u2019s the <a href=\"https:\/\/www.defensenews.com\/congress\/2023\/07\/26\/house-advances-aukus-authorizations-amid-sub-export-control-debate\/\" target=\"_blank\">U.S. export control policy<\/a>, International Traffic in Arms Regulations, or ITAR.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"7848\" height=\"5232\" src=\"\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg\" alt=\"\" class=\"wp-image-117726\" srcset=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg 7848w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg?resize=300,200 300w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg?resize=768,512 768w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg?resize=1024,683 1024w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg?resize=1536,1024 1536w, https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1473353853.jpg.jpg?resize=2048,1365 2048w\" sizes=\"auto, (max-width: 7848px) 100vw, 7848px\" \/><figcaption class=\"wp-element-caption\">From left, Australian Prime Minister Anthony Albanese, U.S. President Joe Biden and British Prime Minister Rishi Sunak arrive for a news conference after a trilateral meeting during the AUKUS summit on March 13, 2023, in San Diego, Calif. (Leon Neal\/Getty Images)<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe good news is that the State Department actually did come forward with an ITAR reform plan,\u201d Courtney said, though the House Foreign Affairs Committee narrowly passed a version of this reform along party lines. Courtney called on lawmakers and the State Department to remain engaged and get the reforms passed this year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reifsteck said the <a href=\"https:\/\/www.defensenews.com\/opinion\/2023\/07\/27\/aukus-succeeds-if-us-eases-defense-regulations-for-allies\/\" target=\"_blank\">ITAR reform is primarily important<\/a> for AUKUS\u2019 second pillar \u2014 an agreement for the three countries to share high-end technologies like quantum computing, artificial intelligence, hypersonics, unmanned systems and more \u2014 but also has some implications for the submarine collaboration in the first pillar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Between 1,000 and 2,500 Australian ship maintenance workers will need to come to the U.S. and learn to work on nuclear-powered boats. Several of the legislative proposals, including the ITAR reform and the <a href=\"https:\/\/www.defensenews.com\/congress\/2023\/05\/17\/pentagon-seeks-authority-to-transfer-nuclear-submarines-to-australia\/\" target=\"_blank\">submarine sale authority<\/a>, must pass so Australian nationals can train in the U.S. and repair Virginia-class submarines here and in Australia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lauren Kahn, a senior research analyst with the Center for Security and Emerging Technology at Georgetown University, praised the AUKUS plan\u2019s consideration of how to \u201cspeed up a partner\u2019s preparedness to deal with these capabilities\u201d by focusing on \u201call the things they can do in the meantime before they have the physical capabilities,\u201d such as building up the workforce, the infrastructure and a cadre of nuclear-trained sailors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But she also noted the challenge of bureaucracy. Beyond passing ITAR and Defense Production Act reforms, she said there are several ways Congress and the Defense Department need to open up the flow of information and the <a href=\"https:\/\/www.defensenews.com\/pentagon\/2023\/03\/07\/big-aukus-news-coming-but-hill-and-allies-see-tech-sharing-snags\/\" target=\"_blank\">sharing of technology<\/a> so the allied navies can seamlessly operate together at sea once the hardware arrives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Courtney said Congress, even as the AUKUS details were being finalized, passed a measure last year allowing Australian sailors to attend the U.S. Navy\u2019s Nuclear Power School in South Carolina, setting a precedent of Congress allowing Australia access to closely held nuclear propulsion technology. The first three Australian naval officers graduated from the program in July; six more are enrolled, and more were selected to attend the school soon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kevin Rudd, the Australian ambassador to the U.S., said during a recent visit to HII\u2019s Newport News Shipbuilding submarine construction yard that AUKUS would be a \u201cvery large transformation\u201d with equally large challenges.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rudd noted the three governments are working \u201cto turn the vision into reality. And that reality requires legislation through the Congress; it also requires active collaboration with <a href=\"https:\/\/www.defensenews.com\/naval\/2023\/03\/15\/how-the-us-plans-to-expand-its-submarine-industrial-base-for-aukus\/\" target=\"_blank\">the United States submarine-industrial base.<\/a>\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThese are large undertakings, but our cause is large as well: to sustain the peace and stability of our wider region\u201d in the Pacific, he added.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><i>This is the second story of a three-part series. <\/i><a href=\"https:\/\/www.defensenews.com\/congress\/2023\/09\/05\/aukus-standoff-australia-uk-wait-on-congress-to-approve-pact\/\" target=\"_blank\"><i>Click here<\/i><\/a><i> to read the first, and <\/i><a href=\"https:\/\/www.defensenews.com\/naval\/2023\/09\/08\/the-us-navy-is-spending-billions-to-stabilize-vendors-will-it-work\/\" target=\"_blank\"><i>click here<\/i><\/a><i> to read the third.<\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.<\/p>\n","protected":false},"author":7,"featured_media":117824,"comment_status":"open","ping_status":"open","sticky":false,"template":"single-post-featured-layout","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_canonical":"","_acf":"","_yoast_wpseo_primary_category":16,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_smg_distribution_targets":[]},"categories":[45,160,29,83,46,11,12,16,36,48],"tags":[],"coauthors":[3354],"class_list":["post-65160","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-pacific","category-daily-news-roundup","category-digital-show-dailies","category-dsei","category-europe","category-global","category-industry","category-naval","category-newsletters","category-the-americas"],"acf":{"subheadline":"","legacy_arc_id":"43DVSXKCNRDRFA3HFIJVBFQI24","arc_canonical_url":"\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/","remove_feature_photo":false,"is_sponsored":false,"subtype":"featured-layout","redirect_url":"","disable_inline_ads":false,"native_logo_pretext":"Presented By:"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Allies target early AUKUS milestones to keep 20-year plan on track - Defense News<\/title>\n<meta name=\"description\" content=\"Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Allies target early AUKUS milestones to keep 20-year plan on track\" \/>\n<meta property=\"og:description\" content=\"Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/\" \/>\n<meta property=\"og:site_name\" content=\"Defense News\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-07T06:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-08T00:59:19+00:00\" \/>\n<meta name=\"author\" content=\"Megan Eckstein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Megan Eckstein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\n\t    \"@context\": \"https:\\\/\\\/schema.org\",\n\t    \"@graph\": [\n\t        {\n\t            \"@type\": \"Article\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#article\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/\"\n\t            },\n\t            \"author\": {\n\t                \"name\": \"migration\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\"\n\t            },\n\t            \"headline\": \"Allies target early AUKUS milestones to keep 20-year plan on track\",\n\t            \"datePublished\": \"2023-09-07T06:00:00+00:00\",\n\t            \"dateModified\": \"2026-08-08T00:59:19+00:00\",\n\t            \"mainEntityOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/\"\n\t            },\n\t            \"wordCount\": 2144,\n\t            \"commentCount\": 0,\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/GettyImages-1239691458.jpg_7eef5c.jpg\",\n\t            \"articleSection\": [\n\t                \"Asia Pacific\",\n\t                \"Daily News Roundup\",\n\t                \"Digital Show Dailies\",\n\t                \"DSEI\",\n\t                \"Europe\",\n\t                \"Global\",\n\t                \"Industry\",\n\t                \"Naval\",\n\t                \"Newsletters\",\n\t                \"The Americas\"\n\t            ],\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"CommentAction\",\n\t                    \"name\": \"Comment\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#respond\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebPage\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/\",\n\t            \"name\": \"Allies target early AUKUS milestones to keep 20-year plan on track - Defense News\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\"\n\t            },\n\t            \"primaryImageOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#primaryimage\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/GettyImages-1239691458.jpg_7eef5c.jpg\",\n\t            \"datePublished\": \"2023-09-07T06:00:00+00:00\",\n\t            \"dateModified\": \"2026-08-08T00:59:19+00:00\",\n\t            \"description\": \"Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.\",\n\t            \"breadcrumb\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#breadcrumb\"\n\t            },\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"ReadAction\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"ImageObject\",\n\t            \"inLanguage\": \"en-US\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#primaryimage\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/GettyImages-1239691458.jpg_7eef5c.jpg\",\n\t            \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/GettyImages-1239691458.jpg_7eef5c.jpg\"\n\t        },\n\t        {\n\t            \"@type\": \"BreadcrumbList\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/2023\\\/09\\\/07\\\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\\\/#breadcrumb\",\n\t            \"itemListElement\": [\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 1,\n\t                    \"name\": \"Home\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t                    \"ad_zone\": \"home\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 2,\n\t                    \"name\": \"Naval\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/naval\\\/\",\n\t                    \"ad_zone\": \"naval\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 3,\n\t                    \"name\": \"Allies target early AUKUS milestones to keep 20-year plan on track\"\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebSite\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"name\": \"Defense News\",\n\t            \"description\": \"Covering the politics, business and technology of defense | Defense News\",\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"SearchAction\",\n\t                    \"target\": {\n\t                        \"@type\": \"EntryPoint\",\n\t                        \"urlTemplate\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/?s={search_term_string}\"\n\t                    },\n\t                    \"query-input\": {\n\t                        \"@type\": \"PropertyValueSpecification\",\n\t                        \"valueRequired\": true,\n\t                        \"valueName\": \"search_term_string\"\n\t                    }\n\t                }\n\t            ],\n\t            \"inLanguage\": \"en-US\"\n\t        },\n\t        {\n\t            \"@type\": \"Organization\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\",\n\t            \"name\": \"Defense News\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"logo\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\n\t                \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"caption\": \"Defense News\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\"\n\t            }\n\t        },\n\t        {\n\t            \"@type\": \"Person\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\",\n\t            \"name\": \"migration\",\n\t            \"image\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec\",\n\t                \"url\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"contentUrl\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"caption\": \"migration\"\n\t            },\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/author\\\/migration\\\/\"\n\t        }\n\t    ]\n\t}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Allies target early AUKUS milestones to keep 20-year plan on track - Defense News","description":"Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Allies target early AUKUS milestones to keep 20-year plan on track","og_description":"Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.","og_url":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/","og_site_name":"Defense News","article_published_time":"2023-09-07T06:00:00+00:00","article_modified_time":"2026-08-08T00:59:19+00:00","author":"Megan Eckstein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Megan Eckstein","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#article","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/"},"author":{"name":"migration","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1"},"headline":"Allies target early AUKUS milestones to keep 20-year plan on track","datePublished":"2023-09-07T06:00:00+00:00","dateModified":"2026-08-08T00:59:19+00:00","mainEntityOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/"},"wordCount":2144,"commentCount":0,"publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1239691458.jpg_7eef5c.jpg","articleSection":["Asia Pacific","Daily News Roundup","Digital Show Dailies","DSEI","Europe","Global","Industry","Naval","Newsletters","The Americas"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/","url":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/","name":"Allies target early AUKUS milestones to keep 20-year plan on track - Defense News","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#primaryimage"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1239691458.jpg_7eef5c.jpg","datePublished":"2023-09-07T06:00:00+00:00","dateModified":"2026-08-08T00:59:19+00:00","description":"Australia, the U.K. and the U.S. have been hard at work since March to get the decades-long AUKUS submarine collaboration plan off to a strong start.","breadcrumb":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#primaryimage","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1239691458.jpg_7eef5c.jpg","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1239691458.jpg_7eef5c.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/2023\/09\/07\/allies-target-early-aukus-milestones-to-keep-20-year-plan-on-track\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/one.sightlinemg.com\/defensenews\/","ad_zone":"home"},{"@type":"ListItem","position":2,"name":"Naval","item":"https:\/\/one.sightlinemg.com\/defensenews\/naval\/","ad_zone":"naval"},{"@type":"ListItem","position":3,"name":"Allies target early AUKUS milestones to keep 20-year plan on track"}]},{"@type":"WebSite","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website","url":"https:\/\/one.sightlinemg.com\/defensenews\/","name":"Defense News","description":"Covering the politics, business and technology of defense | Defense News","publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/one.sightlinemg.com\/defensenews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization","name":"Defense News","url":"https:\/\/one.sightlinemg.com\/defensenews\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","caption":"Defense News"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1","name":"migration","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec","url":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","caption":"migration"},"url":"https:\/\/one.sightlinemg.com\/defensenews\/author\/migration\/"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Defense News","distributor_original_site_url":"https:\/\/one.sightlinemg.com\/defensenews","push-errors":false,"jetpack_featured_media_url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/GettyImages-1239691458.jpg_7eef5c.jpg","_links":{"self":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/65160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/comments?post=65160"}],"version-history":[{"count":1,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/65160\/revisions"}],"predecessor-version":[{"id":65172,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/65160\/revisions\/65172"}],"wp:attachment":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/media?parent=65160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/categories?post=65160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/tags?post=65160"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/coauthors?post=65160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}