{"id":69607,"date":"2025-02-27T19:11:22","date_gmt":"2025-02-27T19:11:22","guid":{"rendered":"https:\/\/one.sightlinemg.com\/defensenews\/uncategorized\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/"},"modified":"2026-08-08T01:18:42","modified_gmt":"2026-08-08T01:18:42","slug":"sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says","status":"publish","type":"post","link":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/","title":{"rendered":"SDA should re-evaluate launch plans as key tech lags, watchdog says"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Space Development Agency should put its next launch of data transport and missile tracking satellites on hold until it demonstrates required laser communications capabilities with the spacecraft already in orbit, according to a government watchdog report.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Government Accountability Office on Wednesday <a href=\"https:\/\/www.gao.gov\/products\/gao-25-106838\" target=\"_blank\">issued a deep-dive review<\/a> of the Space Development Agency\u2019s progress toward demonstrating that its satellites <a href=\"https:\/\/www.defensenews.com\/space\/2024\/09\/04\/space-development-agencys-first-satellites-demo-key-capabilities\/\" target=\"_blank\">can connect in space via a laser link<\/a>. The complex technology allows satellites to share data amongst themselves and with users on the ground using optical communications terminals installed on the spacecraft. The result is much faster, higher-volume data transmissions than traditional systems, which rely on radio frequency beams to send information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Because the satellites in SDA\u2019s constellation are built by multiple vendors, compatibility among terminals and the ability to communicate across a network of hundreds of satellites is key for their vision of high-speed data transport.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">GAO found that while SDA has made progress in some areas \u2014 like developing an optical terminal standard, testing the capability in a lab and maturing some of the enabling technologies \u2014 it hasn\u2019t been able to validate the technology on orbit as fast as it had hoped. That\u2019s in part because of supply-chain challenges that delayed the launch of its demonstration satellites, dubbed Tranche 0, disrupting its timeline for proving the technology works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cAbout one quarter into the 5-year design life of the first T0 satellites, limited capability has been demonstrated,\u201d GAO said. \u201cWe analyzed SDA\u2019s documentation and identified at least eight capabilities as central to demonstrating a mesh network with laser communications technology and could have been demonstrated in T0.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Further, GAO argues that SDA\u2019s mandate to rapidly deliver a proliferated satellite constellation \u2014 launching satellites with new capabilities on a two-year cycle \u2014 is part of the problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSDA\u2019s schedule-driven focus impedes its ability to incorporate lessons from each tranche, a key feature of iterative development,\u201d GAO said. \u201cAs a result, it has not fully incorporated lessons learned and corrective updates into these follow-on efforts.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The agency has successfully demonstrated some laser communication capabilities. Last September, it conducted an optical crosslink test using its 27 Tranche 0 satellites. At the time, SDA Director Derek Tournear said the successful test marked the completion of all the agency\u2019s Tranche 0 demonstration targets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then in January, two SDA contractors \u2014<a href=\"https:\/\/www.defensenews.com\/space\/2025\/01\/09\/space-development-agency-validates-high-speed-satellite-comm-links\/\" target=\"_blank\"> SpaceX and York Space Systems<\/a> \u2014 validated the ability to connect two of their satellites in orbit, proving a key linkage between spacecraft built by different vendors.<\/p>\n\n\n\t<aside class=\"smg-interstitial-link wp-block-smg-interstitial-link\">\n\t\t<a href=\"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/01\/09\/space-development-agency-validates-high-speed-satellite-comm-links\/\" class=\"smg-interstitial-link__inner\">\n\t\t\t\t\t\t\t<div class=\"smg-interstitial-link__media\">\n\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"188\" src=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/T2BETA_PROGRAM_REVIEWED1.jpg.jpg?w=300\" class=\"smg-interstitial-link__image wp-post-image\" alt=\"\" \/>\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"smg-interstitial-link__content\">\n\t\t\t\t<span class=\"smg-interstitial-link__kicker\">Related<\/span>\n\t\t\t\t<h3 class=\"smg-interstitial-link__title\">Space Development Agency validates high-speed satellite comm links<\/h3>\n\t\t\t\t\t\t\t\t\t<p class=\"smg-interstitial-link__excerpt\">During a demo, York Space Systems and SpaceX connected two of their satellites via a laser communication link, proving a key technology for SDA.<\/p>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/a>\n\t<\/aside>\n\t\n\n\n<p class=\"wp-block-paragraph\">While these successful demonstrations are \u201ca significant step,\u201d GAO said, they make up only a small portion of the milestones the Tranche 0 satellites were expected to hit. GAO recommended SDA demonstrate the required optical communications capabilities before its first Tranche 1 launch, which is currently slated for March or April. It made similar recommendations for future tranches.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the report, SDA officials contend that not all of the technologies GAO identified need to be demonstrated. But that statement is at odds with contract language that describes SDA\u2019s intent to demonstrate the capabilities as part of its baseline system, GAO said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Still, SDA concurred with GAO\u2019s recommendations, saying that it does plan to demonstrate key capabilities in one tranche before launching another. In a Feb. 6 memo, the Defense Department argued that it had met its minimum capability requirements for Tranche 0 and intended to do the same prior to fielding future tranches.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An SDA spokesperson told Defense News in a statement Thursday that while GAO is accurate to say the agency hasn\u2019t demonstrated the \u201cfull range\u201d of laser communications capabilities, it has met the foundational objectives it set for Tranche 0.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSDA successfully met the baseline objectives set forth in Tranche 0; proving critical technology and providing lessons learned for both the government and vendor teams, thereby enabling the Proliferated Warfighter Space Architecture to deliver future capabilities to the warfighter rapidly and efficiently,\u201d the spokesperson said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe will continue to apply lessons learned across the PWSA, employing a spiral development model with each tranche&nbsp;building upon earlier generations \u2013 and informing the development of&nbsp;those capabilities with the latest available technology advancements and intelligence assessments,\u201d SDA continued.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The agency is currently addressing concerns raised by GAO and may further delay its first Tranche 1 launch, which was previously slated for last year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The watchdog assessment comes as SDA\u2019s performance \u2014 and its director \u2014 face heightened scrutiny within DOD.<\/p>\n\n\n\t<aside class=\"smg-interstitial-link wp-block-smg-interstitial-link\">\n\t\t<a href=\"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/07\/pentagon-acquisition-office-orders-review-of-space-development-agency\/\" class=\"smg-interstitial-link__inner\">\n\t\t\t\t\t\t\t<div class=\"smg-interstitial-link__media\">\n\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/26_c4isrnet_spacedevelopment.jpg.jpg?w=300\" class=\"smg-interstitial-link__image wp-post-image\" alt=\"\" \/>\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"smg-interstitial-link__content\">\n\t\t\t\t<span class=\"smg-interstitial-link__kicker\">Related<\/span>\n\t\t\t\t<h3 class=\"smg-interstitial-link__title\">Pentagon acquisition office orders review of Space Development Agency<\/h3>\n\t\t\t\t\t\t\t\t\t<p class=\"smg-interstitial-link__excerpt\">The review is meant to ensure that SDA is on a path to deliver a proliferated satellite constellation that meets Defense Department requirements.<\/p>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/a>\n\t<\/aside>\n\t\n\n\n<p class=\"wp-block-paragraph\">In late January, the Pentagon\u2019s acting acquisition executive, Steve Morani, <a href=\"https:\/\/www.defensenews.com\/space\/2025\/02\/07\/pentagon-acquisition-office-orders-review-of-space-development-agency\/\" target=\"_blank\">ordered a review of SDA\u2019s progress<\/a> as well as its organizational structure. An independent review team will consider schedule and development risks and propose remedies to mitigate any issues it identifies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The team will also evaluate the structure of the agency, which currently operates as a standalone acquisition office within the Space Force. Rather than report to the service\u2019s primary development and procurement field command, SDA reports directly to the assistant secretary of the Air Force for space acquisition and integration and the chief of space operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile, <a href=\"https:\/\/www.defensenews.com\/space\/2025\/02\/20\/space-development-agency-to-re-bid-contentious-prototype-contract\/\" target=\"_blank\">Tournear was placed on administrative leave<\/a> Jan. 16 as the Air Force Office of the Inspector General investigates a past contract action that may have violated the federal Procurement Integrity Act.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><i>Editor\u2019s note: This story was updated to include a statement from the Space Development Agency.<\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A watchdog argued the Space Development Agency&#8217;s focus on rapid development is creating blind spots when it comes to validating key capabilities.<\/p>\n","protected":false},"author":7,"featured_media":39507,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_canonical":"","_acf":"","_yoast_wpseo_primary_category":23,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_smg_distribution_targets":{"9":{"categories":["space","home","battlefield-tech"],"primary_category":"space"}}},"categories":[160,33,36,23],"tags":[],"coauthors":[3468],"class_list":["post-69607","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-news-roundup","category-home","category-newsletters","category-space"],"acf":{"subheadline":"","legacy_arc_id":"HEHJ6KUTZBDBLHE276QR2RKQ5Y","arc_canonical_url":"\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/","remove_feature_photo":false,"is_sponsored":false,"subtype":"","redirect_url":"","disable_inline_ads":false,"native_logo_pretext":"Presented By:"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SDA should re-evaluate launch plans as key tech lags, watchdog says - Defense News<\/title>\n<meta name=\"description\" content=\"A watchdog argued the Space Development Agency&#039;s focus on rapid development is creating blind spots when it comes to validating key capabilities.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SDA should re-evaluate launch plans as key tech lags, watchdog says\" \/>\n<meta property=\"og:description\" content=\"A watchdog argued the Space Development Agency&#039;s focus on rapid development is creating blind spots when it comes to validating key capabilities.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/\" \/>\n<meta property=\"og:site_name\" content=\"Defense News\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-27T19:11:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-08T01:18:42+00:00\" \/>\n<meta name=\"author\" content=\"Courtney Albon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Courtney Albon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\n\t    \"@context\": \"https:\\\/\\\/schema.org\",\n\t    \"@graph\": [\n\t        {\n\t            \"@type\": \"Article\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#article\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/\"\n\t            },\n\t            \"author\": {\n\t                \"name\": \"migration\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\"\n\t            },\n\t            \"headline\": \"SDA should re-evaluate launch plans as key tech lags, watchdog says\",\n\t            \"datePublished\": \"2025-02-27T19:11:22+00:00\",\n\t            \"dateModified\": \"2026-08-08T01:18:42+00:00\",\n\t            \"mainEntityOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/\"\n\t            },\n\t            \"wordCount\": 885,\n\t            \"commentCount\": 0,\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/global-comms.jpg_53f065.jpg\",\n\t            \"articleSection\": [\n\t                \"Daily News Roundup\",\n\t                \"Home\",\n\t                \"Newsletters\",\n\t                \"Space\"\n\t            ],\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"CommentAction\",\n\t                    \"name\": \"Comment\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#respond\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebPage\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/\",\n\t            \"name\": \"SDA should re-evaluate launch plans as key tech lags, watchdog says - Defense News\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\"\n\t            },\n\t            \"primaryImageOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#primaryimage\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/global-comms.jpg_53f065.jpg\",\n\t            \"datePublished\": \"2025-02-27T19:11:22+00:00\",\n\t            \"dateModified\": \"2026-08-08T01:18:42+00:00\",\n\t            \"description\": \"A watchdog argued the Space Development Agency's focus on rapid development is creating blind spots when it comes to validating key capabilities.\",\n\t            \"breadcrumb\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#breadcrumb\"\n\t            },\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"ReadAction\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"ImageObject\",\n\t            \"inLanguage\": \"en-US\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#primaryimage\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/global-comms.jpg_53f065.jpg\",\n\t            \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/global-comms.jpg_53f065.jpg\"\n\t        },\n\t        {\n\t            \"@type\": \"BreadcrumbList\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/2025\\\/02\\\/27\\\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\\\/#breadcrumb\",\n\t            \"itemListElement\": [\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 1,\n\t                    \"name\": \"Home\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t                    \"ad_zone\": \"home\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 2,\n\t                    \"name\": \"Space\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/space\\\/\",\n\t                    \"ad_zone\": \"space\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 3,\n\t                    \"name\": \"SDA should re-evaluate launch plans as key tech lags, watchdog says\"\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebSite\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"name\": \"Defense News\",\n\t            \"description\": \"Covering the politics, business and technology of defense | Defense News\",\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"SearchAction\",\n\t                    \"target\": {\n\t                        \"@type\": \"EntryPoint\",\n\t                        \"urlTemplate\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/?s={search_term_string}\"\n\t                    },\n\t                    \"query-input\": {\n\t                        \"@type\": \"PropertyValueSpecification\",\n\t                        \"valueRequired\": true,\n\t                        \"valueName\": \"search_term_string\"\n\t                    }\n\t                }\n\t            ],\n\t            \"inLanguage\": \"en-US\"\n\t        },\n\t        {\n\t            \"@type\": \"Organization\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\",\n\t            \"name\": \"Defense News\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"logo\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\n\t                \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"caption\": \"Defense News\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\"\n\t            }\n\t        },\n\t        {\n\t            \"@type\": \"Person\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\",\n\t            \"name\": \"migration\",\n\t            \"image\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec\",\n\t                \"url\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"contentUrl\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"caption\": \"migration\"\n\t            },\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/author\\\/migration\\\/\"\n\t        }\n\t    ]\n\t}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SDA should re-evaluate launch plans as key tech lags, watchdog says - Defense News","description":"A watchdog argued the Space Development Agency's focus on rapid development is creating blind spots when it comes to validating key capabilities.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"SDA should re-evaluate launch plans as key tech lags, watchdog says","og_description":"A watchdog argued the Space Development Agency's focus on rapid development is creating blind spots when it comes to validating key capabilities.","og_url":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/","og_site_name":"Defense News","article_published_time":"2025-02-27T19:11:22+00:00","article_modified_time":"2026-08-08T01:18:42+00:00","author":"Courtney Albon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Courtney Albon","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#article","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/"},"author":{"name":"migration","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1"},"headline":"SDA should re-evaluate launch plans as key tech lags, watchdog says","datePublished":"2025-02-27T19:11:22+00:00","dateModified":"2026-08-08T01:18:42+00:00","mainEntityOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/"},"wordCount":885,"commentCount":0,"publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/global-comms.jpg_53f065.jpg","articleSection":["Daily News Roundup","Home","Newsletters","Space"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/","url":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/","name":"SDA should re-evaluate launch plans as key tech lags, watchdog says - Defense News","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#primaryimage"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/global-comms.jpg_53f065.jpg","datePublished":"2025-02-27T19:11:22+00:00","dateModified":"2026-08-08T01:18:42+00:00","description":"A watchdog argued the Space Development Agency's focus on rapid development is creating blind spots when it comes to validating key capabilities.","breadcrumb":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#primaryimage","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/global-comms.jpg_53f065.jpg","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/global-comms.jpg_53f065.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/one.sightlinemg.com\/defensenews\/space\/2025\/02\/27\/sda-should-re-evaluate-launch-plans-as-key-tech-lags-watchdog-says\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/one.sightlinemg.com\/defensenews\/","ad_zone":"home"},{"@type":"ListItem","position":2,"name":"Space","item":"https:\/\/one.sightlinemg.com\/defensenews\/space\/","ad_zone":"space"},{"@type":"ListItem","position":3,"name":"SDA should re-evaluate launch plans as key tech lags, watchdog says"}]},{"@type":"WebSite","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website","url":"https:\/\/one.sightlinemg.com\/defensenews\/","name":"Defense News","description":"Covering the politics, business and technology of defense | Defense News","publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/one.sightlinemg.com\/defensenews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization","name":"Defense News","url":"https:\/\/one.sightlinemg.com\/defensenews\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","caption":"Defense News"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1","name":"migration","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec","url":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","caption":"migration"},"url":"https:\/\/one.sightlinemg.com\/defensenews\/author\/migration\/"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Defense News","distributor_original_site_url":"https:\/\/one.sightlinemg.com\/defensenews","push-errors":false,"jetpack_featured_media_url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/global-comms.jpg_53f065.jpg","_links":{"self":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/69607","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/comments?post=69607"}],"version-history":[{"count":1,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/69607\/revisions"}],"predecessor-version":[{"id":69614,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/69607\/revisions\/69614"}],"wp:attachment":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/media?parent=69607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/categories?post=69607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/tags?post=69607"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/coauthors?post=69607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}