{"id":71195,"date":"2025-10-13T17:00:00","date_gmt":"2025-10-13T17:00:00","guid":{"rendered":"https:\/\/one.sightlinemg.com\/defensenews\/uncategorized\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/"},"modified":"2026-08-08T01:16:29","modified_gmt":"2026-08-08T01:16:29","slug":"army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027","status":"publish","type":"post","link":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/","title":{"rendered":"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The U.S. Army has conducted a thorough assessment of supply chain risks to build the Future Long-Range Assault Aircraft, the MV-75, and is aiming to deliver the prototype aircraft in fiscal 2027, the program executive officer for Army aviation, Brig. Gen. David Phillips, told Defense News in a recent interview.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following calls from Army senior leaders to dramatically accelerate the MV-75\u2019s fielding, plans conveyed earlier this year to hit production of the advanced tiltrotor by FY28 still stand, according to Army aviation leadership in the same interview.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Textron\u2019s Bell won the contract to build the aircraft in late 2022, beating out a Lockheed Martin\u2019s Sikorsky and Boeing team. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cI think that is fundamental to any of these accelerated efforts that the supply chain has to be energized. They have to be all leaning forward together,\u201d Phillips said. \u201cWe went down and we visited a lot of suppliers to make sure they could accelerate. Everybody from the landing gear suppliers to the \u2026 engine suppliers, Bell\u2019s internal supply chain for their drive system, we want to make sure that all that could accelerate as well.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While the supply chain is looking ready to accelerate, it still poses the \u201chighest risk\u201d to moving quickly, Phillips emphasized.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While speeding up any major procurement program contains substantial risk, Army aviation leaders and Bell say the program is unique in the sense that significant risk was driven down through digital design, engineering and a technology demonstration effort, where it flew the V-280 Valor tiltrotor for over 200 hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe intend to deliver the prototype aircraft in FY27, earlier is better, and then in FY28, going into production,\u201d Phillips said. \u201cWe genuinely think we can get there. The goals are realistic; they don\u2019t come without some risk.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Army plans to complete the critical design review phase in 2026 and will then begin ramping up hardware production, Phillips said. Even so, Bell has a long list of parts that are already in production, he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And Bell has also decided to build the aircraft\u2019s fuselage in-house at its facilities in Wichita, Kansas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The training base is also beginning to take shape. The U.S. Marine Corps delivered an MV-22 tiltrotor to Fort Rucker, Alabama, where the Army trains its aviators, \u201ca couple of months ago,\u201d Maj. Gen. Clair Gill, the Army Aviation Center of Excellence commander, told Defense News.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And Army aviators are both learning on the Marines\u2019 simulator and flying the aircraft with them, he added.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The acceleration effort has not resulted in any change to the requirements the Army has already defined for its future aircraft.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe\u2019re not trading any requirements to go faster,\u201d Brig. Gen. Cain Baker, who is in charge of the service\u2019s future vertical lift efforts, said. \u201cThe right to repair, [modular open system architecture], speed, range, sustainability aspects \u2014 all of that remains the same,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe have not come off of any of those requirements and Bell has not come back at all asking to come off those requirements,\u201d Baker said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Army is also not making compromises to safety, Phillips emphasized. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.<\/p>\n","protected":false},"author":7,"featured_media":120025,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_canonical":"","_acf":"","_yoast_wpseo_primary_category":14,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_smg_distribution_targets":[]},"categories":[78,160,29,12,14,36],"tags":[],"coauthors":[3330],"class_list":["post-71195","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ausa-digital-show-dailies","category-daily-news-roundup","category-digital-show-dailies","category-industry","category-land","category-newsletters"],"acf":{"subheadline":"","legacy_arc_id":"F4A3FVEBLBFJHPHU5JLTKMN2OY","arc_canonical_url":"\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/","remove_feature_photo":false,"is_sponsored":false,"subtype":"","redirect_url":"","disable_inline_ads":false,"native_logo_pretext":"Presented By:"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027 - Defense News<\/title>\n<meta name=\"description\" content=\"The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027\" \/>\n<meta property=\"og:description\" content=\"The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/\" \/>\n<meta property=\"og:site_name\" content=\"Defense News\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-13T17:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-08T01:16:29+00:00\" \/>\n<meta name=\"author\" content=\"Jen Judson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jen Judson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\n\t    \"@context\": \"https:\\\/\\\/schema.org\",\n\t    \"@graph\": [\n\t        {\n\t            \"@type\": \"Article\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#article\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/\"\n\t            },\n\t            \"author\": {\n\t                \"name\": \"migration\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\"\n\t            },\n\t            \"headline\": \"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027\",\n\t            \"datePublished\": \"2025-10-13T17:00:00+00:00\",\n\t            \"dateModified\": \"2026-08-08T01:16:29+00:00\",\n\t            \"mainEntityOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/\"\n\t            },\n\t            \"wordCount\": 527,\n\t            \"commentCount\": 0,\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/9064828.jpg.jpg\",\n\t            \"articleSection\": [\n\t                \"AUSA\",\n\t                \"Daily News Roundup\",\n\t                \"Digital Show Dailies\",\n\t                \"Industry\",\n\t                \"Land\",\n\t                \"Newsletters\"\n\t            ],\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"CommentAction\",\n\t                    \"name\": \"Comment\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#respond\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebPage\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/\",\n\t            \"name\": \"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027 - Defense News\",\n\t            \"isPartOf\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\"\n\t            },\n\t            \"primaryImageOfPage\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#primaryimage\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#primaryimage\"\n\t            },\n\t            \"thumbnailUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/9064828.jpg.jpg\",\n\t            \"datePublished\": \"2025-10-13T17:00:00+00:00\",\n\t            \"dateModified\": \"2026-08-08T01:16:29+00:00\",\n\t            \"description\": \"The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.\",\n\t            \"breadcrumb\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#breadcrumb\"\n\t            },\n\t            \"inLanguage\": \"en-US\",\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"ReadAction\",\n\t                    \"target\": [\n\t                        \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/\"\n\t                    ]\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"ImageObject\",\n\t            \"inLanguage\": \"en-US\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#primaryimage\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/9064828.jpg.jpg\",\n\t            \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/9064828.jpg.jpg\"\n\t        },\n\t        {\n\t            \"@type\": \"BreadcrumbList\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/2025\\\/10\\\/13\\\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\\\/#breadcrumb\",\n\t            \"itemListElement\": [\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 1,\n\t                    \"name\": \"Home\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t                    \"ad_zone\": \"home\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 2,\n\t                    \"name\": \"Land\",\n\t                    \"item\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/land\\\/\",\n\t                    \"ad_zone\": \"land\"\n\t                },\n\t                {\n\t                    \"@type\": \"ListItem\",\n\t                    \"position\": 3,\n\t                    \"name\": \"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027\"\n\t                }\n\t            ]\n\t        },\n\t        {\n\t            \"@type\": \"WebSite\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#website\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"name\": \"Defense News\",\n\t            \"description\": \"Covering the politics, business and technology of defense | Defense News\",\n\t            \"publisher\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\"\n\t            },\n\t            \"potentialAction\": [\n\t                {\n\t                    \"@type\": \"SearchAction\",\n\t                    \"target\": {\n\t                        \"@type\": \"EntryPoint\",\n\t                        \"urlTemplate\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/?s={search_term_string}\"\n\t                    },\n\t                    \"query-input\": {\n\t                        \"@type\": \"PropertyValueSpecification\",\n\t                        \"valueRequired\": true,\n\t                        \"valueName\": \"search_term_string\"\n\t                    }\n\t                }\n\t            ],\n\t            \"inLanguage\": \"en-US\"\n\t        },\n\t        {\n\t            \"@type\": \"Organization\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#organization\",\n\t            \"name\": \"Defense News\",\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/\",\n\t            \"logo\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\n\t                \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"contentUrl\": \"https:\\\/\\\/one.sightlinemg.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/defensenews-logo-white.png\",\n\t                \"caption\": \"Defense News\"\n\t            },\n\t            \"image\": {\n\t                \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/logo\\\/image\\\/\"\n\t            }\n\t        },\n\t        {\n\t            \"@type\": \"Person\",\n\t            \"@id\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/#\\\/schema\\\/person\\\/cc76c831bb37a926738c8391fca7a3b1\",\n\t            \"name\": \"migration\",\n\t            \"image\": {\n\t                \"@type\": \"ImageObject\",\n\t                \"inLanguage\": \"en-US\",\n\t                \"@id\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec\",\n\t                \"url\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"contentUrl\": \"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g\",\n\t                \"caption\": \"migration\"\n\t            },\n\t            \"url\": \"https:\\\/\\\/one.sightlinemg.com\\\/defensenews\\\/author\\\/migration\\\/\"\n\t        }\n\t    ]\n\t}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027 - Defense News","description":"The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027","og_description":"The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.","og_url":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/","og_site_name":"Defense News","article_published_time":"2025-10-13T17:00:00+00:00","article_modified_time":"2026-08-08T01:16:29+00:00","author":"Jen Judson","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jen Judson","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#article","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/"},"author":{"name":"migration","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1"},"headline":"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027","datePublished":"2025-10-13T17:00:00+00:00","dateModified":"2026-08-08T01:16:29+00:00","mainEntityOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/"},"wordCount":527,"commentCount":0,"publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/9064828.jpg.jpg","articleSection":["AUSA","Daily News Roundup","Digital Show Dailies","Industry","Land","Newsletters"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/","url":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/","name":"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027 - Defense News","isPartOf":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#primaryimage"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#primaryimage"},"thumbnailUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/9064828.jpg.jpg","datePublished":"2025-10-13T17:00:00+00:00","dateModified":"2026-08-08T01:16:29+00:00","description":"The U.S. Army is keeping a close eye on the supply chain that feeds into the production of the Future Long-Range Assault Aircraft.","breadcrumb":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#primaryimage","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/9064828.jpg.jpg","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/9064828.jpg.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/one.sightlinemg.com\/defensenews\/land\/2025\/10\/13\/army-scrutinizes-supply-chain-risks-to-deliver-mv-75-aircraft-by-2027\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/one.sightlinemg.com\/defensenews\/","ad_zone":"home"},{"@type":"ListItem","position":2,"name":"Land","item":"https:\/\/one.sightlinemg.com\/defensenews\/land\/","ad_zone":"land"},{"@type":"ListItem","position":3,"name":"Army scrutinizes supply chain risks to deliver MV-75 aircraft by 2027"}]},{"@type":"WebSite","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#website","url":"https:\/\/one.sightlinemg.com\/defensenews\/","name":"Defense News","description":"Covering the politics, business and technology of defense | Defense News","publisher":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/one.sightlinemg.com\/defensenews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#organization","name":"Defense News","url":"https:\/\/one.sightlinemg.com\/defensenews\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/","url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","contentUrl":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/06\/defensenews-logo-white.png","caption":"Defense News"},"image":{"@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/one.sightlinemg.com\/defensenews\/#\/schema\/person\/cc76c831bb37a926738c8391fca7a3b1","name":"migration","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=gcf4cb6ee0ec29e49e7a963234e4340ec","url":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e8d47be443ce94ce7fc357677b5f9c70235bb1f59e7267a102a74af58c04f59?s=96&d=mm&r=g","caption":"migration"},"url":"https:\/\/one.sightlinemg.com\/defensenews\/author\/migration\/"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Defense News","distributor_original_site_url":"https:\/\/one.sightlinemg.com\/defensenews","push-errors":false,"jetpack_featured_media_url":"https:\/\/one.sightlinemg.com\/wp-content\/uploads\/2026\/08\/9064828.jpg.jpg","_links":{"self":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/71195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/comments?post=71195"}],"version-history":[{"count":1,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/71195\/revisions"}],"predecessor-version":[{"id":71205,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/posts\/71195\/revisions\/71205"}],"wp:attachment":[{"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/media?parent=71195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/categories?post=71195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/tags?post=71195"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/one.sightlinemg.com\/defensenews\/wp-json\/wp\/v2\/coauthors?post=71195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}